-
Road construction, on RT-139 EB at COVERED RDWY
SCHEDULED WORK CREW; NEW TRAFFIC PATTERN IN EFFECT MOTORISTS PROHIBITED FROM MAKING LEFT TURNS FROM THE NEWARK BAY EXTENSION ONTO JERSEY AVENUE NO RIGHT TURNS FROM 139 TO JERSEY AVENUE.
-
Lane closed, on HOLLAND TUNL WB at HOLLAND TUNL
This tunnel is open westbound to New Jersey for passenger cars, buses and two and three axle single unit trucks. Commercial traffic restricted eastbound to New York. One of two lanes will be closed westbound to New Jersey Sunday nights to Friday mornings from 11:30pm to 5:30am, and 12:01am to 8am Saturday mornings. These lane closures are required to facilitate PANY amp;NJ construction activity and maintenance. One of two lanes may be closed eastbound to New York Sunday night to Friday mornings 11pm to 5am, and Saturday 12:01am to 8am.
-
Lane closed, on LINCOLN TUNL WB at LINCOLN TUNL
One of three tubes is closed Monday through Friday from 11pm to 5am and Saturday 1am to 9am and Sunday from 1am to 10am for PANY NJ maintenance activity. During these times two tubes will remain open with two lanes of traffic available in each direction. These lane closures are required to facilitate PANY amp; NJ work.
-
Lane closed, on RT-9A at MURRAY ST
long term road construction on NY 9A in both directions at Murray Street until 3:00 PM, 09 04 08Comment: 9A West Street between Thames Street and Vesey Street. Alternate lane closures
-
Lane closed, on HOLLAND TUNL EB at HOLLAND TUNL
This tunnel is open westbound to New Jersey for passenger cars, buses and two and three axle single unit trucks. Commercial traffic restricted eastbound to New York. One of two lanes will be closed westbound to New Jersey Sunday nights to Friday mornings from 11:30pm to 5:30am, and 12:01am to 8am Saturday mornings. These lane closures are required to facilitate PANY amp;NJ construction activity and maintenance. One of two lanes may be closed eastbound to New York Sunday night to Friday mornings 11pm to 5am, and Saturday 12:01am to 8am.
-
Slow traffic, on HOLLAND TUNNEL OUTBOUND WB at HOLLAND TUNNEL OUTBOUND EXIT
EXPECT DELAYS; DELAYS; INBOUND DOING OK; DELAYS UP TO 15 MINUTES.
-
Slow traffic, on IOUND BROOKLYN BATTERY TUNL at BROOKLYN BATTERY TUNL
MODERATE CONGESTION; SLOW TRAFFIC; OUTBOUND DOING OK; ALLOW EXTRA TIME.
-
Roadway reduced to one lane, on W HOUSTON ST at HUDSON ST
One lane of traffic will be maintained at all times from January 3 to late November 2008. Three lanes are maintained on Varick Street at the intersection with Houston Street from 10pm to 6am and full width reopened to traffic non working hours. This work will continue to late November 2008 and is related to long term NYCDDC reconstruction.
-
Road construction, on I-278 EB at SUNSET PARK INDUSTRIAL PARK
road construction, reduced to two lanes on I 278 eastbound from Sunset Park Industrial Park; 38th Street Exit to Route 27 Prospect Expressway Exit until 7:00 PM, 12 11 08
-
Lane closed, on BROOKLYN BATTERY TUNL NB at BROOKLYN BATTERY TUNL
The inbound exit to Trinity Place is closed Monday to Friday 6am to 10am and 3pm to 7pm. There are three lanes inbound and one lane outbound 6am to 10am weekdays. As of November 27th on weekdays from 4pm to 7pm there are two lanes outbound to Brooklyn in the south tube plus one contra flow lane in the north tube to Brooklyn. During these times one lane in north tube will be open inbound to Manhattan. One of two tubes may be closed as needed with two way traffic maintained in the open tube 10pm 5:30am, Sunday nights to Friday mornings. These lane closures are to facilitate MTA work.
-
Road construction, on NEW YORK CITY at NEW YORK CITY
RESTRICTIONS; PARKING REGULATIONS CON T: THE 3RD PHASE OF NEW SIGN INSTALLATION WILL STARTED YESTERDAY, AUGUST 18TH, SUSPENDING ALTERNATE SIDE IN COBBLE HILL, CARROLL GARDENS AND AREAS WEST OF COURT ST UFN.
-
Closed, on CENTRE ST at CHAMBERS ST
ROAD CLOSED; FOR THE SUMMER STREETS FESTIVAL WATCH FOR CLOSURES ON LAFAYETTE ST FROM READE ST ONTO 4TH AVE, THEN ONTO UNION SQUARE EAST AND ONTO PARK AVE SOUTH AND UP TO 72ND ST AND WEST TO CENTRAL PARK WILL OCCUR ON AUGUST 23 FROM 7AM UNTIL APPROXIMATELY 1PM ; SEEK ALTERNATE.
-
Road construction, on GOWANUS EXPY at BROOKLYN QUEENS EXPY
One of three inbound northbound lanes is closed. A second lane may be closed as needed except 6am to 11am Monday to Friday. In addition the Hamilton Avenue Clinton Street entrance to the Battery Tunnel is closed as needed with the exception of 6am to 11am Monday to Friday when one lane is maintained for traffic. These closures are necessary to facilitate NYSDOT pile driving and ramp work until the end of January 2, 2009.
-
Slow traffic, on OUTBOUND LINCOLN TUNL at OUTBOUND LINCOLN TUNL
EXPECT DELAYS; DELAYS; INBOUND IS OK; DELAYS UP TO 5 MINUTES.
-
Lane closed, on LINCOLN TUNL EB at LINCOLN TUNL
One of three tubes is closed Monday through Friday from 11pm to 5am and Saturday 1am to 9am and Sunday from 1am to 10am for PANY NJ maintenance activity. During these times two tubes will remain open with two lanes of traffic available in each direction. These lane closures are required to facilitate PANY amp; NJ work.
-
Incident, on I-278 EB at 30TH ST
delays on I 278 eastbound from 30th Street to Sackett Street Effective Dates : Starting on 08 17 08 08:45 PM until further notice
-
Lane closed, on I-278 WB at EXIT 26B
long term road construction, right lane closed on I 278 westbound from Exit 26B Hamilton Avenue to Route 27 Prospect Expressway Exit until 2:00 PM, 12 28 08
-
Closed, on MULBERRY ST at CANAL ST
ROAD CLOSED; FOR THE MULBERRY STREET PEDESTRIAN MALL FROM 11AM TO 6PM, UNTIL SEPTEMBER 7TH NO BUSES AFFECTED ; SEEK ALTERNATE.
-
Slow traffic, on BROOKLYN BRG EB at BROOKLYN BRG
MODERATE CONGESTION; SLOW TRAFFIC; ON THE SPAN INBOUND DOING OK; ALLOW EXTRA TIME.
-
Closed, on HAMILTON AVE at CLINTON ST
One lane may be closed on the above roadways northbound towards the Brooklyn Battery tunnel from 10am to 3pm weekdays. One lane may be closed on the above roadways southbound towards the Verrazano Narrows Bridge from 7am to 3pm weekdays to facilitate NYSDOT long term work.
-
Road construction, on W HOUSTON ST at BROADWAY
Two lanes of traffic are maintained on Broadway and one lane in each direction on West Houston Street from 10pm to 7am Sunday nights to Saturday morning, and 10pm Saturday to 9am Sunday nightly; all lanes are restored to traffic other times. This work will occur until late November 2008 to facilitate NYCDDC reconstruction.
-
Road construction, on I-278 EB at RT-27
long term road construction on I 278 eastbound from Route 27 Prospect Expressway Exit to Exit 26B Hamilton Avenue until 3:00 PM, 01 14 09Comment: A second lane may be closed as needed except from 6am to 11am Monday thru Friday.
-
Lane closed, on MULBERRY ST at BROOME ST
This street will be closed 11am to 6pm May 19 through September 7, 2008 for the Mulberry Street Pedestrian Mall as permitted by the Mayor s Street Activity Permit Office SAPO .
-
Lane closed, on MANHATTAN BRG EB at MANHATTAN BRG
There are five lanes from 6am to 10am Monday to Friday westbound Manhattan bound of which two are on the north upper roadway the left lane HOV2 and three on the lower roadway; two lanes are maintained on the south upper roadway eastbound Brooklyn bound . There are three lanes westbound and two eastbound 10am to 3pm Monday to Friday. No trucks are permitted on the North Upper westbound roadway from 5am to 3pm Monday to Friday. Overnight Monday to Friday from 3pm to 5am the next day, there are five lanes eastbound and two lanes westbound. There are five lanes westbound to Manhattan and two lanes eastbound to Brooklyn over the weekend from 9pm Friday to 10am Monday. The north bikeway is open, and the south walkway open at all times. One lane on the lower roadway is closed at all times. Lane closures may occur on weekends and overnight for maintenance and construction activity on a as needed basis through April 2009.
-
Road construction, on 5TH AVE at 24TH ST
Effective March 24, 2008 through February 2009, 5th Avenue is one way southbound to facilitate NYCDDC roadway reconstruction work.
-
Road construction, on E HOUSTON ST at BROADWAY
Two lanes in each direction are maintained within work area until late November 2008 to facilitate NYCDDC long term reconstruction.
-
Closed, on 3RD AVE at PROSPECT EXPY
One lane may be closed on the above roadways northbound towards the Brooklyn Battery tunnel from 10am to 3pm weekdays. One lane may be closed on the above roadways southbound towards the Verrazano Narrows Bridge from 7am to 3pm weekdays to facilitate NYSDOT long term work.
-
Road construction, on RT-27 at 4TH AVE
road construction, reduced to two lanes on NY 27 in both directions from 4th Avenue to 8th Avenue starting 10:04 PM, 08 18 08 until 5:00 AM, 08 22 08
-
Traffic congestion, on GOWANUS SB at BROOKLYN BRG
HEAVY CONGESTION; ALLOW EXTRA TIME.
-
Road maintenance operations, on BROOKLYN QUEENS EXPY at SANDS ST
One of three lanes in each direction will be closed 12:01am to 1am, and two of three lanes one direction at a time will be closed 1am to 5am Tuesday to Friday to facilitate NYSDOT rehabilitation activity until the end of 2009.
-
Lane closed, on MANHATTAN BRG WB at MANHATTAN BRG
There are five lanes from 6am to 10am Monday to Friday westbound Manhattan bound of which two are on the north upper roadway the left lane HOV2 and three on the lower roadway; two lanes are maintained on the south upper roadway eastbound Brooklyn bound . There are three lanes westbound and two eastbound 10am to 3pm Monday to Friday. No trucks are permitted on the North Upper westbound roadway from 5am to 3pm Monday to Friday. Overnight Monday to Friday from 3pm to 5am the next day, there are five lanes eastbound and two lanes westbound. There are five lanes westbound to Manhattan and two lanes eastbound to Brooklyn over the weekend from 9pm Friday to 10am Monday. The north bikeway is open, and the south walkway open at all times. One lane on the lower roadway is closed at all times. Lane closures may occur on weekends and overnight for maintenance and construction activity on a as needed basis through April 2009.
-
Road construction, on HENRY HUDSON PKY NB at EXIT 9
long term road construction on Henry Hudson Parkway northbound at Exit 9 72nd Street until 12:00 AM, 07 12 09Comment: Roadway maintenance N B exit to West 72nd Street will be closed U.F.N. Motorist should use the West 79th Street exit or use West 57th Street to West End Avenue.
-
Construction work, on W 60TH ST at AMSTERDAM AVE
This street was converted to one way eastbound to facilitate NYCDEP water shaft work until the end of September 2008.
-
Lane closed, on I-278 EB at EXIT 29A
road construction, right lane closed on I 278 eastbound at Exit 29A Manhattan Bridge starting 10:00 PM, 08 18 08 until 5:00 AM, 08 21 08
-
Road construction, on I-278 EB at SANDS ST
long term road construction on I 278 eastbound from Sands Street to Exit 29B Tillary Street until 5:00 AM, 06 04 09
-
Road maintenance operations, on WILLOUGHBY ST at LAWRENCE ST
One lane of traffic is maintained to facilitate NYCT subway station rehabilitation until the end of 2009. One lane in each direction will be maintained on Jay Street at Myrtle Avenue Metro Tech 7pm to 6am nightly until late August 2008.
-
Closed, on GOLD ST at FULTON ST
This street is closed until Spring 2009 to facilitate NYCDOT water main work.
-
Construction work, on FULTON ST at GOLD ST
The eastbound segment of this roadway as well as access to Ryders Alley is closed to facilitate long term capital water main and roadway work by NYCDDC to Spring 2009.
-
Road construction, on E 13TH ST at AVENUE D
This street was converted to a two way dead end street as of March 19, 2005 for four years, related to NYCDEP s pumping station project.
-
Road construction, on E 12TH ST at AVENUE D
East 12th Street was converted March 19, 2005 for four years to one way westbound, and Szold Place to one way southbound to assist with NYCDEP s pumping station project.
-
Road construction, on SZOLD PL at E 12TH ST
East 12th Street was converted March 19, 2005 for four years to one way westbound, and Szold Place to one way southbound to assist with NYCDEP s pumping station project.
-
Closed, on AVENUE D at E 12TH ST
This roadway was closed as of March 19, 2005, for four years, to facilitate NYCDEP pumping station capital project.
-
Construction work, on FRANKLIN D ROOSEVELT DR at EAST 23RD ST
road construction, reduced to two lanes on Franklin D. Roosevelt Drive in both directions at East 23rd Street starting 11:00 PM, 08 07 08 until 5:00 AM, 08 29 08Comment: to faciliate roadway work by a private contractor.
-
Closed, on CARLTON AVE BRG at PACIFIC ST
This bridge was closed January 23, 2008. Motorists and bicyclist should use alternate route or follow posted detour. Pedestrians must use the adjacent 6th Avenue Bridge, or Vanderbilt Avenue. This is a long term project to upgrade the LIRR yard and construct a new bridge. This work is being performed by a private developer contractor and scheduled for completion January 2010.
-
Construction work, on QUEENS MIDTOWN TUNL EB at QUEENS MIDTOWN TUNL
One lane may be closed in each direction as needed Sunday nights to Friday mornings from 11:30pm to 5:30am for tunnel maintenance and construction work by MTA until further notice.
-
Closed, on 65TH ST at 3RD AVE
One lane may be closed on the above roadways northbound towards the Brooklyn Battery tunnel from 10am to 3pm weekdays. One lane may be closed on the above roadways southbound towards the Verrazano Narrows Bridge from 7am to 3pm weekdays to facilitate NYSDOT long term work.
-
Lane closed, on I-278 at EXIT 30
long term road construction on I 278 in both directions from Exit 30 Flushing Avenue to Sands Street until 12:36 AM, 12 04 09Comment: closures until 2009Monday FridayOne lane closed 12:01 A.M. 1:00 A.M.Two lanes closed 12:01A.M. 5:00 A.M.
-
Construction work, on QUEENS MIDTOWN TUNL WB at QUEENS MIDTOWN TUNL
One lane may be closed in each direction as needed Sunday nights to Friday mornings from 11:30pm to 5:30am for tunnel maintenance and construction work by MTA until further notice.
-
Lane closed, on I-495 at NEW YORK-QUEENS COUNTY NTY LINE
long term road construction, right lane closed on I 495 in both directions from New York Queens County Line; Queens Midtown Tunnel to Greenpoint Avenue; Exit 14 until 3:00 PM, 09 30 08
-
Closed, on 86TH ST at 5TH AVE
This roadway may be closed 8pm to 5am weeknights until the end of November 2008 to facilitate NYCDDC roadway and precinct building construction activity.
-
Construction work, on FRANKLIN D ROOSEVELT DR at 63RD ST
road construction, reduced to two lanes on Franklin D. Roosevelt Drive in both directions at 63rd Street starting 11:00 PM, 08 07 08 until 5:00 AM, 08 29 08Comment: to facilitate roadway work by a private contractor.
-
Lane closed, on I-278 at EXIT 32
long term road construction, right lane closed on I 278 in both directions from Exit 32 Williamsburg Bridge Metropolitan Avenue to Exit 30 Flushing Avenue until 5:00 AM, 12 07 08
-
Road construction, on QUEENSBORO BRG NB at QUEENSBORO BRG
The North Inner Lower Roadway is Manhattan bound with access from Queens Plaza North to Second Avenue and East 60th Street. The South Inner Lower roadway is Queens bound with access from 2nd Avenue to Queens Plaza South. Trucks are allowed on the lower inner roadways only. Trucks are prohibited from the upper and outer roadways. The North Upper Roadway is Manhattan bound at all times. Access is to East 62nd Street East 63rd Street in Manhattan from Thomson Avenue, 21st Street at Queens Plaza North, and 11th Street at Queens Plaza South in Queens. The South Upper Roadway is Queens bound except from 5:30 am to 11am weekdays when the roadway is reversed and accommodates the Manhattan bound high occupancy vehicle HOV lane Manhattan bound high occupancy vehicle HOV lane containing two or more people from 6am to 10am, Monday to Friday. Access is to East 58th Street East 57th Street in Manhattan from Thomson Avenue or 21st Street at 43rd Avenue in Queens.