Bronx Parking

Top Bronx Parking

open/close
See All Parking

Hot City Destinations

open/close

Recent Parking Reviews

open/close

in Bronx

  • Lane closed, on LINCOLN TUNL WB at LINCOLN TUNL

    One of three tubes is closed Monday through Friday from 11pm to 5am and Saturday 1am to 9am and Sunday from 1am to 10am for PANY NJ maintenance activity. During these times two tubes will remain open with two lanes of traffic available in each direction. These lane closures are required to facilitate PANY amp; NJ work.

  • Road construction, on NEW YORK CITY at NEW YORK CITY

    RESTRICTIONS; PARKING REGULATIONS CON T: THE 3RD PHASE OF NEW SIGN INSTALLATION WILL STARTED YESTERDAY, AUGUST 18TH, SUSPENDING ALTERNATE SIDE IN COBBLE HILL, CARROLL GARDENS AND AREAS WEST OF COURT ST UFN.

  • Road construction, on HENRY HUDSON PKY NB at EXIT 9

    long term road construction on Henry Hudson Parkway northbound at Exit 9 72nd Street until 12:00 AM, 07 12 09Comment: Roadway maintenance N B exit to West 72nd Street will be closed U.F.N. Motorist should use the West 79th Street exit or use West 57th Street to West End Avenue.

  • Construction work, on W 60TH ST at AMSTERDAM AVE

    This street was converted to one way eastbound to facilitate NYCDEP water shaft work until the end of September 2008.

  • Closed, on HENRY HUDSON PKY SB at W 95TH ST

    One of three southbound lanes may be closed as needed 10am to 3pm and 10pm to 6am weekdays, 10pm Friday to 7am Saturday, and 10pm Saturday to 10am Sunday. Two of three southbound lanes may be closed 12:01am to 5am Tuesday to Friday, 1am to 6am Saturday and 2am to 9am Sunday to facilitate NYC Parks Department work until April 2009.

  • Lane closed, on HENRY HUDSON PKY SB at 95TH ST EXIT

    long term road construction on Henry Hudson Parkway southbound from 95th Street Exit to 79th Street Exit until 3:00 PM, 04 30 09Comment: Two lanes closed after 1:00am. This is to facilitate NYC Parks Department work.

  • Closed, on 65TH ST at 3RD AVE

    One lane may be closed on the above roadways northbound towards the Brooklyn Battery tunnel from 10am to 3pm weekdays. One lane may be closed on the above roadways southbound towards the Verrazano Narrows Bridge from 7am to 3pm weekdays to facilitate NYSDOT long term work.

  • Closed, on 86TH ST at 5TH AVE

    This roadway may be closed 8pm to 5am weeknights until the end of November 2008 to facilitate NYCDDC roadway and precinct building construction activity.

  • Construction work, on FRANKLIN D ROOSEVELT DR at 63RD ST

    road construction, reduced to two lanes on Franklin D. Roosevelt Drive in both directions at 63rd Street starting 11:00 PM, 08 07 08 until 5:00 AM, 08 29 08Comment: to facilitate roadway work by a private contractor.

  • Road construction, on 2ND AVE at EAST 96TH

    As of April 24, 2007 four lanes of traffic maintained 7am to 10am, and 3pm to 7pm weekdays, three lanes other times to facilitate long term NYCT Second Avenue Subway construction activity to the end of 2010.

  • Road construction, on GRAND CENTRAL PKY at EXIT 5

    road construction, reduced to two lanes on Grand Central Parkway in both directions from Exit 5 Astoria Boulevard to Exit 24 Little Neck Parkway starting 10:02 AM, 08 19 08 until 10:00 AM, 08 20 08

  • Slow traffic, on GRAND CENTRAL PKY WB at LAGUARDIA INTERNATIONAL AIRPORT

    EXPECT DELAYS; DELAYS; ON ARRIVALS DUE TO VOLUME PASSENGERS TRAVELING TO FLORIDA ARE ADVISED TO CALL THEIR INDIVIDUAL CARRIERS AS DELAYS CANCELLATIONS ARE POSSIBLE DUE TO TROPICAL STORM FAY ; DELAYS UP TO 30 MINUTES.

  • Off ramp closed, on GRAND CENTRAL PKY EB at EXIT 7

    road construction, exit ramp closed on Grand Central Parkway eastbound at Exit 7 Laguardia Airport starting 10:00 PM, 06 19 08 until 4:00 AM, 08 31 08Comment: Motorist should use exit 6 94th Street to access the airport during these hours.

  • Paving operations, on GRAND CENTRAL PKY EB at EXIT 9

    paving operations, reduced to two lanes on Grand Central Parkway eastbound from Exit 9 I 678 Route 25A Northern Boulevard to Exit 10 I 495 starting 10:00 PM, 08 18 08 until 6:00 AM, 08 22 08

  • Lane closed, on I-678 NB at WHITESTONE EXPY

    long term road construction on I 678 northbound at Whitestone Expressway until 3:00 PM, 12 31 08Comment: Two lanes closed after 1:00am. These closures are to facilitate NYSDOT reconstruction activity.

  • Closed, on WHITESTONE EXPY at VAN WYCK EXPY

    All two lanes from the northbound Van Wyck Expressway ramp to the northbound Whitestone Expressway will shift to the right onto newly constructed bridge deck. One lane may be closed on the Whitestone Expressway, as needed, in each direction from 10am to 3pm weekdays; 10pm to 5am Monday nights to Friday mornings; 10pm Friday to 6am Saturday and 10pm Saturday to 11am Sunday. Two lanes in each direction may be closed 1am to 5am Tuesday to Friday; 1am to 6am Saturday, and 2am to 9am Sunday to facilitate NYSDOT reconstruction activity through December 2008.

  • Road construction, on W 110TH ST at FREDERICK DOUGLASS CIR

    Work at Frederick Douglas Circle, while maintaining 3 lanes within the circle, will continue through January 2009 to facilitate NYCDDC roadway reconstruction.

  • Road construction, on HENRY HUDSON PKY NB at 125TH ST EXIT

    road construction, reduced to one lane on Henry Hudson Parkway northbound from 125th Street Exit to Exit 13 158th Street starting 11:45 PM, 08 18 08 until 5:00 AM, 08 22 08

  • Lane closed, on GEORGE WASHINGTON BRG EB at GEORGE WASHINGTON BRG

    Lane closures may occur off peak hours to facilitate PANY NJ maintenance work. Three of four upper level lanes to New York eastbound will be closed weekends from 10pm Friday to 10am Saturday and from 10pm Saturday to 10am Sunday through the fall of 2008 except Holiday weekends of July 3 and Labor Day to facilitate pavement rehabilitation work. Additionally the Palisades Parkway entrance closed and diverted to lower level through Fort Lee Fletcher Avenue .

  • Closed, on BRONX WHITESTONE BRG NB at BRONX WHITESTONE BRG

    One lane may be closed northbound to the Bronx Noon to 3pm Monday, 10am to 3pm Monday to Thursday, and 10am to 2:30pm Friday, and 6am to noon Saturday and Sunday. One lane may be closed southbound to Queens 10am to 3pm Monday to Thursday, and 10am to 2:30pm Friday, 6am to noon Saturday and Sunday. Two of four lanes may be closed Queens bound Monday night to Friday mornings from 10pm to 6am, and 11pm to 6am Friday and Saturday nights. One lane in each direction may be closed Saturday and Sunday from 6am to 11:59am to facilitate MTA deck replacement work.

  • Closed, on BRONX WHITESTONE BRG SB at BRONX WHITESTONE BRG

    One lane may be closed northbound to the Bronx Noon to 3pm Monday, 10am to 3pm Monday to Thursday, and 10am to 2:30pm Friday, and 6am to noon Saturday and Sunday. One lane may be closed southbound to Queens 10am to 3pm Monday to Thursday, and 10am to 2:30pm Friday, 6am to noon Saturday and Sunday. Two of four lanes may be closed Queens bound Monday night to Friday mornings from 10pm to 6am, and 11pm to 6am Friday and Saturday nights. One lane in each direction may be closed Saturday and Sunday from 6am to 11:59am to facilitate MTA deck replacement work.

  • Road construction, on I-87 NB at WILLIS AVE

    road construction, reduced to two lanes on I 87 Major Deegan Expressway northbound at Willis Avenue starting 10:00 AM, 08 18 08 until 3:00 PM, 08 22 08

  • Closed, on EXTERIOR ST at E 149TH ST

    This roadway was closed as of December 4th, 2006 until March 27, 2008 to facilitate long term new building and roadway reconstruction for the Bronx Terminal Market. Effective March 28th, 2008 one lane in each direction reopened to traffic, while the eastern half of the roadway remains under construction until April 2009.

  • Lane closed, on HARLEM RIVER DR NB at 145TH ST

    road construction on Harlem River Drive northbound at 145th Street until 5:00 AM, 03 07 09Comment: Two lanes closed after midnight.

  • Road construction, on E 149TH ST at PARK AVE

    Two lanes in each direction will be maintained to facilitate NYCDDC roadway reconstruction until the end of December 2008.

  • Closed, on GRAND CONCOURSE at E 159TH ST

    Lanes have been reopened on the Grand Concourse. One lane in each direction is subject to closure for punch list work activity. One lane is maintained in each direction on East 161st Street between Grand Concourse and Sheridan Avenue. The north sidewalk in the East 161st Street underpass is closed. This work is scheduled until the end of August 2008.

  • Road construction, on JEROME AVE at E 161ST ST

    One lane will be maintained northbound and two lanes southbound to facilitate crane operation for private development from February 4th to the end of August 2008.

  • Road construction, on BRONX RIVER PKY at E TREMONT AVE

    long term road construction, reduced to two lanes on Bronx River Parkway in both directions at E. Tremont Avenue; Exit 5 starting 10:00 AM, 07 21 08 until 3:00 PM, 09 10 08

  • Closed, on HARLEM RIVER DR SB at DYCKMAN ST

    One lane may be closed southbound from 10am to 3pm, 10pm to 5am weekdays, and 10pm Friday to 7am Saturday, 11pm Saturday to 2pm Sunday to facilitate NYC Parks Department repairs.

  • Road construction, on HARLEM RIVER DR SB at DYKEMAN AND TENTH

    road construction on Harlem River Drive southbound from Dykeman And Tenth to I 95 George Washington Bridge starting 10:00 AM, 04 07 08 until 3:00 PM, 12 30 08

  • Road construction, on I-87 SB at WEST FORDHAM RD EFFECTIVE DATES STARTING ON 08

    road construction on I 87 Major Deegan Expressway southbound at West Fordham Road Effective Dates : Starting on 08 18 08 02:43 PM until further notice

  • Lane closed, on HENRY HUDSON BRG NB at HENRY HUDSON BRG

    One of four lanes southbound Manhattan bound on lower level is closed for long term construction by the MTA. One additional southbound lane may be closed 10am to 3pm Monday to Friday. One of four lanes northbound Bronx bound will be closed Monday to Friday on the upper level 7am to 2pm, and two of four lanes closed 9am to 2pm weekdays.

  • Road construction, on I-87 at WEST 230TH ST

    road construction, reduced to two lanes on I 87 Major Deegan Expressway in both directions at West 230th Street starting 10:00 AM, 08 18 08 until 3:00 PM, 08 22 08

  • Lane closed, on HENRY HUDSON BRG SB at HENRY HUDSON BRG

    One of four lanes southbound Manhattan bound on lower level is closed for long term construction by the MTA. One additional southbound lane may be closed 10am to 3pm Monday to Friday. One of four lanes northbound Bronx bound will be closed Monday to Friday on the upper level 7am to 2pm, and two of four lanes closed 9am to 2pm weekdays.

  • Road construction, on I-87 at VAN COUNTY LAND PARK SOUTH

    road construction, reduced to two lanes on I 87 Major Deegan Expressway in both directions at Van Corland Park South starting 10:00 AM, 08 18 08 until 3:00 PM, 08 22 08

see alerts for Bronx / close alerts

With a population of almost 100,000 and only an estimated 85 parking locations, finding parking in the Bronx can be a hassle. Whether you’re a visitor trying to find a spot for the the Bronx Zoo, Edgar Allen Poe Cottage, the New York Botanical Garden, a sports fan going to the GHI Bronx Tennis Classic, or Yankees games, or just feel like a night on the town at Roberto’s, G-Bar, or the Hostos Center for Arts and Culture, ParkingCarma is the way to go. Find parking by address, city, or point of interest. And find parking near the LaGuardia or JFK airports or the MTA. Try it! Just type in “Fordham Road” in Bronx, NY and see what you find!

Neighborhoods

  • ...

Events in Bronx, NY

Events Parking provided by
CO2 EMISSIONS SAVED (tons)

0,000,000,001,234,453