Lane closed, on LINCOLN TUNL WB at LINCOLN TUNL
One of three tubes is closed Monday through Friday from 11pm to 5am and Saturday 1am to 9am and Sunday from 1am to 10am for PANY NJ maintenance activity. During these times two tubes will remain open with two lanes of traffic available in each direction. These lane closures are required to facilitate PANY NJ work.
-
Incident, on NEW YORK CITY at NEW YORK CITY
RESTRICTIONS; ALTERNATE SIDE OF THE STREET PARKING RULES WILL BE IN EFFECT SATURDAY, MARCH 20TH METER RULES WILL ALSO BE IN EFFECT .
-
Lane closed, on US-46 WB at BROAD AVE
SCHEDULED WORK CREW; ROAD CLOSED; UNTIL 8 AM; DETOUR LOCAL STREETS AT BROAD AVE EASTBOUND 46 BEFORE GARDEN STATE PARKWAY CLIFTON AT LEAST ONE LANE CLOSED UNTIL 6AM; SEEK ALTERNATE.
-
Lane closed, on US-46 EB at BROAD AVE
SCHEDULED WORK CREW; ROAD CLOSED; UNTIL 8 AM; DETOUR LOCAL STREETS AT BROAD AVE EASTBOUND 46 BEFORE GARDEN STATE PARKWAY CLIFTON AT LEAST ONE LANE CLOSED UNTIL 6AM; SEEK ALTERNATE.
-
Closed, on 65TH ST at 3RD AVE
One lane may be closed on the above roadways northbound towards the Brooklyn Battery tunnel from 10am to 3pm weekdays. One lane may be closed on the above roadways southbound towards the Verrazano Narrows Bridge from 7am to 3pm weekdays to facilitate NYSDOT long term work.
-
Two lanes closed, on GEORGE WASHINGTON BRG EB at GEORGE WASHINGTON BRIDGE INBOUND
SCHEDULED WORK CREW; 2 LEFT LANES CLOSED UNTIL 8AM SLOW ON THE SPAN LOWER LEVEL AND PALISADES ARE EZ PASS ONLY UNTIL 8AM OUTBOUND ROADWORK BLOCKS THE TWO RIGHT LANES ON THE SPAN OF THE UPPER DECK.
-
Closed, on 86TH ST at 5TH AVE
This roadway may be closed as need 9pm to 6am weeknights, and 11pm Friday to 8am Saturday and 11pm Saturday to 8am Sunday to facilitate NYCDDC roadway and precinct building construction activity through June 2010.
-
Lane closed, on GEORGE WASHINGTON BRG EB at GEORGE WASHINGTON BRG
Lane closures may occur off peak hours to facilitate PANY NJ maintenance work.
-
Road construction, on 2ND AVE at EAST 96TH
As of April 24, 2007 four lanes of traffic maintained 7am to 10am, and 3pm to 7pm weekdays, three lanes other times to facilitate long term NYCT Second Avenue Subway construction activity to the end of 2010.
-
Road construction, on MAJOR DEEGAN EXPY SB at CROSS BRONX EXPY
AN ACCIDENT HAS BEEN CLEARED; TRAFFIC STILL IS SLOW THEN AT MOSHOLU PARKWAY ROAD CONSTRUCTION CLOSES THE LEFT LANE UNTIL 5AM.
-
Road construction, on CROSS BRONX EXPY NB at MAJOR DEEGAN EXPY
SCHEDULED WORK CREW; UP TO 2 LANES BLOCKED UNTIL 6:30AM WB IS FINE.
-
Lane closed, on HENRY HUDSON BRG at HENRY HUDSON BRG
SCHEDULED WORK CREW; RIGHT LANE CLOSED; UNTIL FURTHER NOTICE; STAY LEFT.
-
Road construction, on WHITESTONE BRG SB at WHITESTONE BRG
SCHEDULED WORK CREW; 2 LANES BLOCKED UNTIL 5AM BRONX BOUND 2 LANES ALSO ARE SHUT FOR WORK UNTIL 5AM.